One Tool Was Starving Four Teams
A clinical ultrasound project was six months behind schedule. The constraint was not the engineering — it was the register map tool that every team depended on and nobody had questioned.
Tag
4 posts
A clinical ultrasound project was six months behind schedule. The constraint was not the engineering — it was the register map tool that every team depended on and nobody had questioned.
How standardizing a communication protocol on a smartphone-powered defibrillator project unblocked an entire engineering team and saved two months of development time.
You cannot 'sprint' a circuit board design. A systems architect's view on why software methodologies break when applied to physics, and how Critical Chain solves the real constraint.
Why 'Scope Creep' is usually a symptom of a deeper strategic failure—in software, in hardware, and in healthcare.